Asphalt pavement repair - Bergstrasse - Wiliberg, Switzerland

On this page

Topic
Asphalt pavement repair
Object
Bergstrasse
Location
Wiliberg/AG
City
Wiliberg
State
Aargau
Country
Switzerland
Date

Solution

The canton did not want to completely replace the heavily cracked mountain road, but rather use S&P Glasphalt G on the existing pavement as reinforcement and rehabilitate the road with 6 cm binder course and 3 cm surface course as a raised paving. Most of the reinforcement was laid over the entire surface. In some places, the pavement was replaced or the road had to be widened and extended with a retaining wall. In these sections, the reinforcement was then only laid over part of the surface. The approximately one kilometre long section was divided into three daily stages of 300 - 350 m each. In the evening from 6 pm onwards, the 60% polymer-modified emulsion was applied. In the morning at 6 am the reinforcement was laid and from 9 am the subsequent overlay could be installed on top. To prevent the pavement reinforcement from being torn open by the trucks rolling over it, the reinforcement mesh was covered with pre-coated chippings, especially in the curved areas.

Material

1‘600 m2 S&P Glasphalt G, Roll widths: 0.97 m, 1.50 m and 1.95 m

More Projects

Contact

S&P Clever Reinforcement Switzerland

S&P Clever Reinforcement Company AG Headquarters

Seewernstrasse 127
6423 Seewen
Switzerland