Reinforcement of damaged road section - Movegen - Fenstad, Norway

Our client Arctic Asfalt received an assignment to repair a very damaged and deteriorated road section in the Norwegian Municipality of Ness. 

On this page

Topic
Reinforcement of damaged road section
Object
Movegen
City
Fenstad
State
Ness Municipality
Country
Norway
Date

Situation

In the past, the road was a gravel road that throughout the year was expanded and overlaid with asphalt, eventually becoming an asphalt road. It is assumed that the bearing capacity is not sufficient in the unbound layers which had resulted in a total breakdown of the asphalt.

Solution

The solution with asphalt reinforcment was offered by Arctic Asfalt to the Municipality - and they agreed.

In a first step, a levelling asphalt layer of approximately 80 kg/m² was laid. S&P Glasphalt G was subsequently laid on top along a 900 m section of the road, before being topped with 90 kg/m² wearing course.

In this particular case, the prime function of the asphalt reinforcement grid is to protect the wearing course and delay cracks propagating through to the surface.

Material

S&P Glasphalt G

More Projects

Contact

S&P Clever Reinforcement Switzerland

S&P Clever Reinforcement Company AG Headquarters

Seewernstrasse 127
6423 Seewen
Switzerland