AP-8, Bilbao

In October, over several nights, road surface reinforcement work was conducted on the AP-8 between km 109 and 106 near Basauri, heading toward Donostia-San Sebastián.

On this page

Topic
Asphalt reinforcement
Object
Highway AP-8
City
Basauri
State
Basque Country - Province of Vizcaya
Country
Spain
Date

Situation

Cracks had developed in the asphalt surface, a persistent issue since the carriageway was widened from two lanes to three and four lanes.

Solution

The adopted solution involved installing the S&P Glasphalt® G grid directly over the crack, which had been pre-milled and primed with bitumen emulsion, to prevent its recurrence. The grid was installed with sufficient overlap to ensure effective force transmission to the existing pavement. Once applied, the grid was covered with the top asphalt layers—specifically, a binder course and a wearing course.

Material

5500 m² S&P Glasphalt®

More Projects

Contact

S&P Clever Reinforcement Switzerland

S&P Clever Reinforcement Company AG Headquarters

Seewernstrasse 127
6423 Seewen
Switzerland