S&P Asphalt reinforcement
Fibre reinforcement grids for asphalt surfaces
Crack Prevention
The Luzernerstrasse was anyway due to undergo a total renovation in ten to fifteen years. However, the condition of the road was so bad that a surface rehabilitation was absolutely necessary. In order to prevent the existing cracks and utility trenches from breaking through to the surface again within a very short time, they were partially covered with S&P Glasphalt G. Subsequently, a 6 cm layer of asphalt was laid on top.
3000 m2 S&P Glasphalt G, Roll widths: 0.97 m, 1.50 m and 1.95 m