Reinforcement of National Road RN165

S&P asphalt reinforcement grids are the ideal solution for strengthening asphalt structures and resisting various types of deterioration. They are particularly effective in addressing structural fatigue caused by traffic.

On this page

Topic
Reinforcement of National Road RN165
Object
RN165, DIR Ouest
City
Quimper
State
Finistère Department
Country
France
Date

Situation

A 60 km section of National Road RN165 exhibited deterioration characterised by the appearance of transverse and longitudinal cracking.

The pavement structure consisted of concrete slabs (3.5 m wide and 5 m long) overlaid with two bituminous layers. Two areas, with slightly differing structures, were identified:

  • Zone 1: concrete slabs / approx. 4 cm fibre-reinforced BBSG / approx. 2 cm BBTM;
  • Zone 2: concrete slabs / approx. 6 cm fibre-reinforced BBMa / approx. 2.5 cm BBTM.

Problem

As part of this project, several discussions were held with the road authority (DIR Ouest) to present the reinforcement solutions developed by S&P Reinforcement France and to demonstrate their potential to extend pavement service life.

In addition to the initially selected rehabilitation solution—consisting of milling approximately 8 cm of pavement (depending on the section) and replacing it with two new bituminous layers—S&P Reinforcement France proposed carrying out a trial section incorporating its reinforcement grids.

The objective of this trial was to assess, under real operating conditions, the effectiveness of the different reinforcement solutions by comparing reinforced sections with a control section of identical structure, but without reinforcement at the interface between asphalt layers. Performance was analysed in particular with regard to the ability to limit crack reflection and to extend pavement service life.

Three S&P product references were selected and installed across three distinct trial sections (see “Solution” section).

These trial sections will be subject to long-term monitoring in order to compare their condition over time and quantify the contribution of S&P reinforcement to pavement durability.

Solution

  • S&P Carbophalt® G 200/200 : PR 57+920 to PR 58+070 
  • S&P Glasphalt® G : PR 58+150 to PR 58+300
  • S&P Glasphalt® G 65 : PR 58+400 to PR 58+550

Material

S&P Carbophalt® G200/200: 900 m²

S&P Glasphalt® G: 900 m²

S&P Glasphalt® G 65: 900 m²