Foucaud Pharmacy
During the construction of the building, a skylight was added to the project.
On this page
- Topic
- Reinforcement slab opening
- Object
- Foucaud Pharmacy
- City
- Vannes
- State
- Morbihan
- Country
- France
- Date
- Duration
- 1 Day
System
Project Description
Situation
The skylight had not been planned in the upper floor slab, so an opening had to be created in the reinforced concrete structure to allow for its installation.
Solution
To ensure continuity of the reinforcement and the long-term durability of the structure, the upper floor slab was strengthened using S&P C‑Laminate.
Material
12,9 m S&P C-Laminate 60/1,4 & 5kg S&P Resin 220 HP