Pontchaillou Hospital
New technical equipment was installed in the hospital, requiring a new opening to route various power cables.
On this page
- Topic
- Reinforcement slab opening
- Object
- Pontchaillou Hospital
- City
- Rennes
- State
- Ille-et-Vilaine
- Country
- France
- Date
- Duration
- 1 Day
System
Project Description
Problem
The concrete floor had to be cut, resulting in the severing of the reinforcement and a loss of structural continuity.
Solution
As the opening was located directly in line with the load-bearing beam, the S&P C‑Laminate carbon NSM (near-surface mounted) solution was designed to minimise the impact on the future use of the room. As the laminates are embedded within the concrete, no additional mechanical protection is required.
Material
20 m S&P C-Laminate 10/2,8 & 6kg S&P Resin 55 HP