Repair and Reinforcement of columns - Estação Fluvial Sul E Sueste (South and Southeast River Station) - Lisbon, Portugal

The Sul e Sueste River Station, inaugurated on 28 May 1932, closed in 2011 due to structural problems and general neglect, and reopened on 1 May 2021, after being rehabilitated in order to guarantee its functionality as a maritime-tourist fluvial terminal.

On this page

Topic
Repair and Reinforcement of columns
Object
Estação Fluvial Sul E Sueste (South and Southeast River Station)
City
Lisbon
State
Lisbon
Country
Portugal
Date
Duration
1 Month

Situation

From a general and comprehensive structural analysis carried out by the design office A2P, with solutions adopted for the different pathologies of the building, such as the strengthening of beams with increased cross section by concrete encasement, a solution was adopted for the strengthening of central columns by carbon fibre encasement. In this case, it was found, in general, that the failure of the columns was due to inefficient column lashing. Thus, it was decided to reinforce the columns with carbon fibre sheets.

Solution

Quick to install, easy to install, efficient reinforcement and little intrusion allowing the original cross-section to be maintained.

Material

90 m² of S&P C-Sheet 240, 60 kg S&P Resin 55 HP, 100 mm of  S&P C-Laminate SM (150/2000) 80/1.4, S&P Resin 220 HP - 30 kg
S&P Tecnogrout-FIB - 400 kg  