Re-establishing reinforcement in a collapsed edge beam - Project for the Danish Road Directorate - Bridge 14-0-073 OF sløjfen, Denmark

One of the bridge's edge beams had been hit and the damage had caused major damage, destroying parts of the concrete and 7 pre-stressed cables.

On this page

Topic
Re-establishing reinforcement in a collapsed edge beam
Object
Project for the Danish Road Directorate
City
Bridge 14-0-073 OF sløjfen
State
Gentofte Municipality
Country
Denmark
Date

Situation

Re-establishing pre-tensioned cables would be an expensive and time-consuming solution that would cause major traffic challenges on the busy motorway under the bridge.

Solution

The bridge's edge beam was restored to its original profile by a concrete repair and then the reinforcement was established with embedded carbon fibre rods (S&P C-Rod), which were placed in a milled groove filled with glue (Near Surface Mounted solution). The 7 pre-stressed cables could be replaced with just 4 carbon fibre rods ø8mm. At one end at the centre of the concrete beam, carbon fibre sheet (S&P C-Sheet) was secured as a U-shaped enclosure. The work was carried out overnight and in a very short time, causing only minor disruption to traffic. 

Material

S&P C-Rod ø8mm, S&P Resin 220 HP, S&P C-Sheet, S&P Resin 55 HP