Restoration of pedestrian underpass - Bodenstrasse - Küssnacht, Switzerland
The reinforcement work using S&P CFK-Laminates was carried out in four stages over the course of 3 months.
On this page
- Topic
- Restoration of pedestrian underpass
- Object
- Bodenstrasse
- Location
- Küssnacht/SZ
- City
- Küssnacht
- State
- Schwyz
- Country
- Switzerland
- Date
System
S&P Case Study
- Download PDF (111.29 KB)
Project Description
Solution
Material
435 m’ S&P CFK-Laminates, type 150/2000, 50 x 1.2 mm,
Fld = 60 kN