Reinforcement - Liquid manure pit - Inwil, Switzerland

The application of the S&P slot-applied laminates was carried out in 10 working days.

On this page

Topic
Reinforcement
Object
Liquid manure pit
Location
Inwil/LU
City
Inwil
State
Luzern
Country
Switzerland
Date

S&P Case Study

Solution

With the dismantling of the cladding, it was necessary to reinforce the 3.8-meter-high outer wall against additional bending moment at the middle of the wall. According to static calculations, an application of 3 m long S&P CFK-Laminates 150/2000 (dimensions 20 x 1.4 mm) in pairs, spaced 50 cm apart, was necessary. To avoid additional UV protection coats and work, the laminates were inserted into ca. 8-mm-wide milled slots. The load-transferring application of the laminates is ensured using S&P Resin 220, 2-K epoxy adhesive, which is applied on a prepared bearing substrate in an unloaded state (empty tanks).

Material

545 m’ S&P slot-applied laminates, type 150/2000, 20 x 1.4 mm,
Fld = 46 kN

Contact

S&P Clever Reinforcement Switzerland

S&P Clever Reinforcement Company AG Headquarters

Seewernstrasse 127
6423 Seewen
Switzerland