Reinforcement - Liquid manure pit - Inwil, Switzerland
The application of the S&P slot-applied laminates was carried out in 10 working days.
On this page
- Topic
- Reinforcement
- Object
- Liquid manure pit
- Location
- Inwil/LU
- City
- Inwil
- State
- Luzern
- Country
- Switzerland
- Date
System
S&P Case Study
- Download PDF (110.05 KB)
Project Description
Solution
With the dismantling of the cladding, it was necessary to reinforce the 3.8-meter-high outer wall against additional bending moment at the middle of the wall. According to static calculations, an application of 3 m long S&P CFK-Laminates 150/2000 (dimensions 20 x 1.4 mm) in pairs, spaced 50 cm apart, was necessary. To avoid additional UV protection coats and work, the laminates were inserted into ca. 8-mm-wide milled slots. The load-transferring application of the laminates is ensured using S&P Resin 220, 2-K epoxy adhesive, which is applied on a prepared bearing substrate in an unloaded state (empty tanks).
Material
545 m’ S&P slot-applied laminates, type 150/2000, 20 x 1.4 mm,
Fld = 46 kN