Project Description
Situation
Solution
Some of the concrete surface was grinded off and the edges were rounded off. Damaged concrete parts were rounded off. After wetting the concrete to capillary saturation, the first layer of S&P ARMO-crete w RQ was applied. The ARMO-mesh L200 (carbon fibres in the horizontal direction) was then pressed into the freshly applied mortar. Next, the second layer of ARMO-crete w RQ was applied using the wet-in-wet method, troweled off, and ground to the desired smoothness. A protective coat was applied, thus completing the reinforcement.
Material
approx. 4 tons of S&P ARMO-crete w RQ and 100 m2 ARMO-mesh L200