Reinforcement - Underground Garage, Coop, Kasparstrasse - Bern, Switzerland
The application of the pre-stressed CFK-Laminates was carried out in three parts in a total of seven working days.
On this page
- Topic
- Reinforcement
- Object
- Underground Garage, Coop, Kasparstrasse
- Location
- Coop, Kasparstrasse, Bern/BE
- City
- Bern
- State
- Bern
- Country
- Switzerland
- Date
System
S&P Case Study
- Download PDF (125.47 KB)
Project Description
Solution
With pre-stressed S&P CFK-Laminates, as well as concrete bearers, the dilation joints of the parking deck on the third basement level (-3) are coupled using frictional force-transfering connections. To achieve this, max. 2 x 4 laminates are applied onto the upper deck surface, to the left and right of the columns. The low-modulus laminates (E-Modul 170 kN/mm2) are pre-stressed to ca. 14 tons or 6 per mil (‰) using a press, and simultaneously stuck on to the deck using the epoxy-mortar S&P Resin 220. The small installation thickness of the pre-stressed laminates enable its application in the 4cm thick top concrete layer.
Material
44 pre-stressed S&P CFK-Laminates 150/2000 Type 100/1.4 mm, length 4.00 m