The aim of the repair and reinforcement work was to rehabilitate the Vargelas and Fontaínhas tunnels along their entire length, in order to maintain an adequate state of conservation and extend the useful life of the stone masonry tunnel structure built in 1887. The challenge was to materialise a reinforcement solution that would make it possible to maintain the height of the tunnels and with the relevant constraints.

Topic 
Repair & reinforcement of centuries-old tunnels on the Douro Line
Object 
Vargelas & Fontainhas tunnels
City 
Vargelas & Pocinho Stations
State 
Districts of Viseu & Guarda
Country 
Portugal
Date 
2021
Duration 
6 Months

Situation

The tunnels showed significant structural damage, with open cracks of high severity, sometimes with tailings and in some cases associated with deformations of the vault. They also had extensive areas of degraded, eroded joints, which occasionally reached complete collapse.
The constraints of the intervention included the line being closed from 10pm to 6am, the fact that it was located in the area of the National Ecological and Agricultural Reserves, classified as a UNESCO World Heritage Site, the Alto Douro Wine Region, which implied, among other things, special waste management clauses. The available space and access, existing gauges, lighting and ventilation of the tunnel were also taken into account. 

Solution

Based on the survey carried out, it was decided to implement four rehabilitation and reinforcement solutions:

Type 1 Solution: Outside the Tunnel - Tympanum and Return Walls of the Inlet and Outlet Openings

Previous cleaning of the masonry (under controlled pressure), brightening and refilling of joints (S&P ARMO-mur), nailing of the tympanum wall next to the frame of the inlet and outlet openings.

Type 2 Solution: Inside the Tunnel - near the tunnel entrances and exits

For an extension of around 15 m from the tunnel entrance and exits, cleaning, repairing broken blocks, brightening and closing joints, treating cracks with mineral regularisation mortar and structural reinforcement with a lime-based mortar system (S&P ARMO-mur) associated with carbon fibre mesh coated with amorphous mineral silicate (S&P ARMO-mesh 200/200).

Type 3 Solution: Inside the Tunnel - Remaining Extension

Cleaning, repair of cracks and broken blocks, treatment of protruding elements, whitening and re-sealing of joints (S&P ARMO-mur) and treatment of areas with deep erosion in the masonry.

Type 4 Solution: Inside the Tunnel

The solution consists of reinforced concrete reinforcement panels, with main and secondary panels. The main reinforced concrete panels are made up of 0.25 x 0.25 metre "staves", spaced 1.20 metres apart, locked at the base with tubular metal profiles. The "lower beam" is made up of an SHS profile embedded and filled with S&P Tecnogrout-N Rapido fast setting mortar, leaving waiting rods. Openings were made in the shafts and vault, and the reinforcements were mounted on them, leaving the waiting reinforcement embedded in the metal profile. Then, after the formwork had been erected, the staves and the secondary panels between them were filled with S&P Tecnogrout-N mortar in stages. 
A Type 4 solution was also considered for the Vargelas tunnel to repair the deformation of the vault.

The particular characteristics of the S&P ARMO System, a mortar solution reinforced with a carbon fibre mesh in a thin layer (in this case 3 cm thick), made it possible to maintain the required space and shape inside the tunnels. This, combined with the rapid curing characteristics of the S&P Tecnogrout-N Rapido fluid repair mortar, made it possible to carry out this project in the limited daily time window available.

Material

 S&P ARMO-mesh 200/200 - 780 m²
 S&P ARMO-mur -  81 025 kg
 S&P Tecnogrout-FIB -  3 000 kg
 S&P Tecnogrout-N -  65 500 kg
 S&P Tecnogrout-N Rápido-  17 500 kg

Image Gallery

  • Spraying the 1st layer on the S&P ARMO-mur

    Spraying the 1st layer on the S&P ARMO-mur

  • Spraying the 2nd layer on the S&P ARMO-mur 

    Spraying the 2nd layer on the S&P ARMO-mur 

  • Application of the S&P ARMO-mur mortar top layer

    Application of the S&P ARMO-mur mortar top layer

  • Tunnel exit after reinforcement and repair works

    Tunnel exit after reinforcement and repair works

  • Final appearance of the rehabilitation works

    Final appearance of the rehabilitation works

Service

Contact person

  • Filipe Dourado

    Mr.FilipeDourado

    Branch Manager

    Phone 
    +351 212253371
    Mobile 
    +351 933530346
    Email 
    FDourado@sp-reinforcement.pt
    Location 
    S&P Clever Reinforcement Ibérica, Lda

    Rua José Fontana, N°76
    Zona Industrial Stª Marta de Corroios
    PT-2845-408 Amora

    Portugal

S&P responsible site

You are here

    Contact

    Legal info

    Legal info

    • About Simpson Strong-Tie®

      Since 2012 S&P has been part of Simpson Strong-Tie, an international building products company based in California with multiple locations across Europe.

      The company is committed to helping customers succeed by providing exceptional code-listed products, full-service engineering and field support, product testing and training, and on-time product delivery.

    SIMPSON Strong-Tie

    Meta Navigation en-EU