Links: Mobile Menu v1

Languages

FX-70-6MP™

Epoxy / Mortar / Additives

FX-70-6MP™ - Multi-Purpose Marine Epoxy Grout

FX-70-6MP™ Multi-Purpose Marine Epoxy Grout is a three-component, 100% solids, moisture-tolerant epoxy grout specifically designed for underwater applications as part of the FX‑70® Structural Repair and Protection System.

Field of application

  • As a high-strength epoxy grout component of the FX‑70® structural repair and protection system
  • As a high-strength epoxy grout in wet or dry applications
  • As an underwater repair mortar Joint repair

Advantages

  • Easily pumped or poured
  • High-strength, low absorption, impact-resistant grout
  • Can be placed underwater without de-watering
  • Resistant to chemical and aggressive water environments

Documentation and Literature

Technical Data Sheet FX-70-6MP™
Safety Data Sheet FX-70-6MP™, Component A
Safety Data Sheet FX-70-6MP™, Component B
Safety Data Sheet FX-70-6MP™, Component C

Tab Group

Technical Data

Please refer to the current technical data sheet for details.

Logistic Data

Storage
Store dry between 4–35 °C
Shelf Life
2 years in unopened packaging
Packaging
FX-70-6MP™ unit with 2 bagscontains9.3 kg component A , 4 kg component B, 2 x 25 kg component C
FX-70-6MP™ unit with 3 bagscontains9.3 kg component A , 4 kg component B, 3 x 25 kg component C

Safety Data

For detailed safety information it is recommended to seek advice in the current safety data sheet in the service area above.

Installation Instructions

FX-70-6MP™ can be trowelled, poured, pumped, or tremied. Properly mixed FX-70-6MP™ can be poured from the top of the jacket through standing water. For pumping applications, pump properly mixed FX-70-6MP™ as follows: Install pumping ports at 90 degrees from tongue and groove joint, alternating sides. Place the first port approximately 30 cm from the bottom of the jacket. Place subsequent ports at a maximum 1.5 m vertical spacing, alternating sides. Begin pumping from the lowest port and move up from port to port. Do not exceed 3 m pumping distance from any individual port. All submerged forms should be inspected by a certified professional diver during the filling process to check for leaks and proper placement. For tremie applications, make sure the hose extends all the way to the bottom of the form. Fill the form to the desired level, allowing water to displace from the top of the form. Depending on the depth of the pour and size of the vessel, the tremie hose may need to be retracted as the form fills to maintain flow.

Meta Navigation en-CH

Contact

Region

S&P