Prior to 2006, Widoczna street in the populous city of Warsaw, Poland, was repeatedly being repaved with new layers of asphalt being installed on top of the existing hexagonal paving slabs.

Topic 
Asphalt pavement repair
Object 
Widoczna street
City 
Warsaw
State 
Mazovia
Country 
Poland
Date 
2006

Situation

The City Road Administration (ZDM) of Warsaw were looking for a more durable solution as a result of repeatedly needing to repave Widoczna street due to excessive cracking and deformation on the wearing course. Prior to 2006, the road was being repaired approximately every 3 years and this led to not only high maintenance costs, but also traffic disruption and a needless use of resources every time the road was being repaved.

However any solution that was offered had to be carried out on a weekend and fall in line with the time parameters of road closures. So essentially road repairs may only start on the Friday evening, but the road had to be re-open to traffic on the Monday morning latest.

Solution

S&P recommended the use of S&P Carbophalt® G combined with a high-strength SMA surface layer over the entire surface and the City Road Administration (ZDM) of Warsaw accepted the recommendation and "took the risk" of trying a new solution to resolve the recurring problems on the road. 

In November 2006, the damaged road surface was milled to a depth of 4 cm, leaving approximately 1 cm of old asphalt on top of the existing hexagonal paving blocks. S&P Carbophalt® G was then installed onto bitumen tack coat on top before being covered with a 4 cm SMA asphalt layer wearing course.

Project tracking

As the goal of the project was to increase the durability of the road, S&P continued to track the condition of the road during the following years - ultimately with great results. Even 10 years later in 2016, the road condition was still great meaning that the S&P asphalt reinforcement grid had definitely served it's purpose and significantly increased the service life of the road as well as protecting the new wearing course from crack propagation from the subgrade - especially when considering the previous re-paving cycles of 3 years.

The increase in durability of the road was not surprising considering the solution provided. S&P asphalt reinforcement grids serve to distribute the traffic load and shear forces that occur in the pavement structure. This ultimately helps to prevent the formation of microcracks, which when formed often lead to wider damage and cracking which becomes visible on the surface. Not only that, but in the this particular case the preimum properties of carbon fibre in S&P Carbophalt® G helped to increase the stiffness of the asphalt construction, as a result of the large force absorption capacity of the fibres.

Material

S&P Carbophalt® G

S&P Carbophalt® G consists of carbon and glass fibre strands that are 100% impregnated with bitumen. The flexible, adaptable grid allows laying in curves as well as adaptation of the meshes to the subgrade or its surface structure. The granular aggregate of the new asphalt layers can penetrate the grid meshes, and a very high layer bond can be achieved via this interlocked connection. This ensures that the fibres are optimally bonded and can effectively absorb crack-generating tensile forces. This effectively prevents the reflection of cracks from the existing pavement into new asphalt layers and the resulting consequential damage. The reinforcement also increases the overall stiffness of the system and thus prevents future stress cracks.

Image Gallery

  • October 2006 - Visible damage on the wearing course, where even the pattern from the underlying hexagonal paving blocks can be seen

  • October 2006 - Visible damage on the wearing course, where even the pattern from the underlying hexagonal paving blocks can be seen

  • October 2006 - Visible damage on the wearing course, where even the pattern from the underlying hexagonal paving blocks can be seen

  • November 2006 - S&P Carbophalt® G installed onto bitumen tack coat

  • July 2007 - Road remained in great condition

  • February 2016 - Nearly 10 years later and still no signs of damage to the wearing course

  • Comparison of the road over the years

Service

Contact person

Case Study

S&P responsible site

You are here

    Contact

    Legal info

    Legal info

    • About Simpson Strong-Tie®

      Since 2012 S&P has been part of Simpson Strong-Tie, an international building products company based in California with multiple locations across Europe.

      The company is committed to helping customers succeed by providing exceptional code-listed products, full-service engineering and field support, product testing and training, and on-time product delivery.

    SIMPSON Strong-Tie

    Meta Navigation en-EU