Branch Indicator

  • You are here: S&P International

Languages

Products

Related System

FX-70 System

Repair and protection of piles (underwater and dry applications)

FX-225

FX-225

FX‑225 Non-Shrink Underwater Grout is a high-strength, non-metallic, non-segregating grout designed with special anti-washout admixtures, corrosion inhibitors and polymers. FX‑225 can be pumped or tremied underwater to grout machinery, fibreglass pile jackets and repair deteriorated concrete without de-watering.

Call to Action

Pin status

This page is not pinned. Pin this.

Features

• Flowable and pumpable
• No de-watering or cofferdams required
• Shrinkage compensated
• Bonds well to concrete, even underwater
• May be extended with clean, washed nominal 9 mm pea gravel
• Ready to use, simply add potable water

Application

• Concrete repairs in marine structures
• Underwater grouting applications
• Pile jacket repairs with the FX‑70® structural repair system
• Seawall repairs without de-watering

Call to Action

Pin status

This page is not pinned. Pin this.

Service

Contact person

Documentation

Country specific Product Information

We provide country specific product information on our branches websites. See this product on:

Data Area

Product Information

We appreciate your interest. Take a look at the data. If you have any questions or need help, please contact us.

Logistic Data

    • Storage
      Strore dry between 4 - 35 °C
    • Shelf Life
      1 year in unopened packaging
    • Packaging
      25 kg bag

Safety Data

  • For detailed safety information it is recommended to seek advice in the current safety data sheet.

Installation Instructions

  • FX-225 can be trowelled, pumped, or tremied. For pumping applications, pump properly mixed FX-225 through a port installed at the bottom of the form (FX-70® Jacket) and fill to the desired level, allowing water to displace from either the top of the form or through a port installed at the top of the form. All submerged forms should be inspected by a professional diver during the filling process to check for leaks and proper placement. For tremie applications, make sure the hose extends all the way to the bottom of the form. Fill the form to the desired level, allowing water to displace from the top of the form. Depending on the depth of the pour and size of the vessel, the tremie hose may need to be retracted as the form fills to maintain flow.

You are here

    Contact

    S&P

    SIMPSON Strong-Tie

    Meta Navigation en-EU