Branch Indicator

  • You are here: S&P International

Languages

Related System

S&P Asphalt reinforcement

Fibre reinforcement grids for asphalt surfaces

S&P Carbophalt® G 200/200

S&P Carbophalt® G 200/200

Carbon fibre asphalt reinforcement grid

S&P Carbophalt® G 200∕200 is a pre-bituminised asphalt reinforcement grid made of carbon fibres for local and/or complete surface reinforcement of bituminous surfaces.

S&P Carbophalt® G 200/200

Call to Action

Pin status

This page is not pinned. Pin this.

Features

  • Measurable improvement of the structural value due to high tensile strength at small elongation
  • Minimises crack formation and prevents crack reflection
  • Prevents fatigue cracks
  • The pre-bituminisation guarantees the required layer bonding between old and new road surfaces (no fixed knots)
  • Lower consumption of tack coat thanks to the pre-bituminised grid
  • Easy and efficient application with unrolling equipment (also in curves)
  • No waiting time - immediate road construction possible
  • Can be milled and recycled without problems
  • Reduces maintenance costs

Application

  • Increases the load bearing capacity of asphalt surfaces
  • Surface reinforcement on roads where the layer height is limited
  • Local application on existing cracks/joints or complete surface application
  • Effectiveness at a cover layer of min. 2 cm

Videos

Asphalt Reinforcement - Kystvejen (Gentofte, Denmark)

Call to Action

Pin status

This page is not pinned. Pin this.

Service

Contact person

Technical Data Sheets

Safety Data Sheets

Country specific Product Information

We provide country specific product information on our branches websites. See this product on:

Data Area

Product Information

We appreciate your interest. Take a look at the data. If you have any questions or need help, please contact us.

Logistic Data

    • Delivery
      Width of roll1.95 m (further on request)
      Length of roll50 m

Application Instructions

  • - Apply S&P Carbophalt® G 200∕200 on dry surface, either by machine or manually, and if possible immediately before the installation of the road surface
    - Apply at temperatures > 3 °C. Observe relevant norms for application of layers
    - Ensure overlapping lengths of 10–20 cm are observed
    - Overlapping of the reinforcement mesh should be optimised, according to the nature and location of joints/cracks, as well as wheel loading
    - If the mesh is applied only on local areas, it shall be covered manually with an asphalt layer. This prevents cracking caused by passing vehicles.
    - Minimum covering of 2 cm above S&P Carbophalt® G 200∕200

    Unrolling equipment is available on a rental basis. S&P will assist and/or carry out the work if requested.

You are here

    Contact

    Legal info

    Legal info

    • About Simpson Strong-Tie®

      Since 2012 S&P has been part of Simpson Strong-Tie, an international building products company based in California with multiple locations across Europe.

      The company is committed to helping customers succeed by providing exceptional code-listed products, full-service engineering and field support, product testing and training, and on-time product delivery.

    SIMPSON Strong-Tie

    Meta Navigation en-EU